Commercial soundproofing.
Built around your project.
Acoustic windows, secondary glazing, wall and ceiling treatments, and door sealing for existing buildings across Sydney.
Zeus works from the noise problem, the construction and the agreed scope, with independent product selection and our own employees for core acoustic installation.
Different buildings.
Practical acoustic solutions.
We welcome enquiries from project teams and property managers seeking acoustic upgrades that work with the building’s use, access and existing finishes.
Builders & head contractors
Discuss acoustic installation scopes, drawings, material requirements and coordination with other trades for renovations and fit-outs.
Strata & facilities managers
Plan noise-control work around residents, building access, approvals and the responsibilities of the property owner or owners corporation.
Hotels, workplaces & shared spaces
Discuss guest-room noise, office privacy, glazing and door upgrades, and acoustic treatments for rooms with different day-to-day uses.
A coordinated approach
to the noise paths.
A product is one part of a treatment. Existing construction, openings, junctions and adjoining spaces influence the scope.
Acoustic windows & secondary glazing
Explore glazing options around the existing windows, operation, noise exposure and thermal requirements.
Wall & ceiling soundproofing
Discuss acoustic insulation, linings and isolation treatments suited to the construction, available space and finish.
Acoustic doors & seals
Consider the door, frame, threshold and surrounding joinery together. Fire-door, access and ventilation requirements form part of selection where applicable.
Assessment & project coordination
Review the noise concern and building details, then agree treatment priorities and any specialist advice or acoustic testing needed.
Start with the
project requirements.
For councils, government facilities and commercial procurement teams, we welcome the opportunity to discuss proposed soundproofing work and the requirements of the procurement process.
Share the scope, location, programme and required documentation so suitability and availability can be considered before a proposal is prepared.
Government work is subject to each buyer’s requirements and procurement process. Zeus does not claim government endorsement or procurement prequalification.
Information to include in your project brief
- Site location, building use and noise concerns
- Drawings, schedules and acoustic reports, if available
- Required performance targets and acceptance criteria
- Access, operating hours and staging requirements
- Tender dates, proposed programme and procurement conditions
- Required licence, insurance, safety and product documentation
Specialist design, certification and formal acoustic testing need to be identified and separately scoped where required.
Clear expectations.
Accountable delivery.
Understand
Review the brief, available reports, existing construction and project priorities.
Define
Agree the proposed treatment, scope, exclusions, access needs and finishes.
Coordinate
Plan installation around site requirements and the other work involved.
Review
Review the agreed works and identify the handover records or testing required for the project.
Quality & safety
Read about our installation approach and the management systems we are developing.
Responsible procurement
Explore our commitments to local suppliers, Indigenous business participation and skills development.
Our management systems are being developed. Zeus is not currently independently ISO certified.
Experience in
existing buildings.
Read more about the requirements and work described in Zeus’s existing case studies.
Benedict XVI Retreat Centre
Acoustic work to confessional rooms, including door seals, wall insulation and treatments selected around existing finishes.
Schoenstatt Spirituality Centre
Thermal efficiency upgrade using precision glazing to improve comfort and reduce energy costs in an existing building.
Discuss your project scope.
Send us your project brief or call to discuss the building, the noise problem and the work involved. We’ll confirm what information we need, and the scope and fees for any assessment, before attending site.
- Outline the building use, location and noise concerns
- Share drawings, schedules and reports, if available
- Agree the assessment or works scope, deliverables and fees
Installation, destructive investigation, engineering reports and formal acoustic testing are scoped and priced separately where required.
A first conversation helps us understand the building, programme and procurement requirements before arranging a site visit.
Assessment, consultancy and installation fees are agreed for the scope of each project before work begins.